Flow metrics when the work waits longer than it builds

Stefan-Iulian Tesoi · · 6 min read

Empty railway tracks running into blue fog at a station, with one red signal light far down the line.

Work item age and flow efficiency are the flow metrics that matter once a coding agent builds. An item now spends nearly all its life waiting for a decision, a specification or a review, so flow efficiency falls to single digits and finally reads true. Work item age shows which items are stuck while they are still stuck.

Throughput and cycle time stay on the board. They report what already happened, which is useful for a quarter and late for a Tuesday. The rest of the reporting stack is in engineering metrics that still work once agents build.

Which flow metrics change meaning with agents?

All of them keep their definitions, and most change what they say. Two sources define the set most teams use, and they overlap more than their names suggest.

Mik Kersten's Flow Framework, from his 2018 book Project to Product, measures five things across four item types: features, defects, risks and debts. Daniel Vacanti's work on actionable agile metrics fed the Kanban Guide, which he wrote with John Coleman and which names four mandatory measures: work in progress, throughput, work item age and cycle time.

MeasureWhere it comes fromWhat changes when a coding agent builds
Flow time, cycle timeBothShrinks, and what is left is mostly waiting
Flow velocity, throughputBothRises; now tracks how fast work is specified
Flow load, WIPBothPiles up in the review column
Flow efficiencyFlow FrameworkFalls to single digits, and becomes accurate
Work item ageKanban GuideBecomes the most useful daily signal
Flow distributionFlow FrameworkShows what the agents are being fed

The two measures that gain the most are the ones teams used to skip, because before agents they mostly confirmed what everyone already knew.

Why does flow efficiency fall when building gets faster?

Because flow efficiency is active time divided by total flow time, and an agent shrinks only the active part. The waits around it, for a decision, a specification and a reviewer, stay at people's pace.

Take one item, as an illustration rather than a measured case. Before agents it spent six days from started to accepted, three of them in a column called In progress. Counted as active, those three days gave a flow efficiency near 50%. The figure was flattering: those days held meetings, context switches and two other tickets.

With an agent, the same item spends 3.6 days from started to accepted. The build is a 40-minute run, and review takes 30 minutes of someone's attention. Seventy active minutes out of 3.6 days is under 2% on the calendar, and about 4% measured in working hours.

That collapse is the honest part. An agent run has a start and an end timestamp, so active time is recorded rather than estimated, and the number finally describes the work. The ninety-odd percent left is a list of queues, and each queue has an owner.

Why is work item age a leading indicator?

Because it is available for every open item every day, while cycle time exists only once an item finishes. The Kanban Guide defines work item age as the elapsed time between when an item started and the current date.

Cycle time is a lagging measure by construction. An item stuck for three weeks contributes nothing to it until the day it finishes, and then it arrives as one bad data point in a chart nobody can act on. Work item age reports the same item on day two.

Cycle time says how long the finished items took. Work item age says which unfinished ones are already late.

With agents, age read by column says who to ask. An item that has aged a day in progress usually means an agent stopped for an answer, which when a coding agent gets stuck argues is what it should do. An item that has aged four days in review, after a 40-minute build, is waiting on a person. Laimonade counts how long each item has waited in review in working time, from the moment it entered review, and lists those waits in a Friday retro post.

Age is also what a daily meeting still needs once the repository reports the work, the point made in the agile standup when agents report their own work. The oldest card in each column is the agenda.

What does flow distribution reveal?

It shows what the team chose to feed its agents, because an agent builds whatever it is handed. Distribution is the share of finished items by type: features, defects, risks and debts.

Before agents, distribution mostly reflected capacity. Debt lost every argument because it competed for the same scarce weeks. Once building is cheap, the share is a choice, and it drifts in two recognisable ways:

A healthy distribution is one the team decided in advance, then compares against what it actually finished each month.

Setting up the measures on an existing board

Most boards already hold the data. Jira, Linear and GitHub Projects record every status change with a timestamp, so the work is deciding what the columns mean.

  1. Label each column as active or waiting. Ready is waiting, In progress is active, In Review is waiting until a reviewer opens it.
  2. Show age on every card and sort each column oldest first.
  3. Set a service level expectation from the 85th percentile cycle time of last quarter's finished items. The Kanban Guide calls this the SLE.
  4. Limit work in progress in review. Little's Law says average cycle time equals average WIP divided by average throughput. If reviewers clear 20 items a week and 30 are waiting, the average wait is a week and a half, however fast the agents build.
  5. Tag every item with one flow item type, so distribution needs no extra bookkeeping.

In Laimonade, a coding agent hands finished work back to In Review, and no tool lets it move its own item further. That makes the review column a pure queue: everything aging there is waiting for a person, or for Laimon, whose closures are stamped as its own.

Frequently asked questions

Is flow efficiency below 10 percent a problem?

Not on its own. Single-digit flow efficiency is normal once a coding agent does the building, because active time is measured in minutes. The useful questions are which wait dominates and whether it is shrinking. A team at 4% whose review wait is falling is improving; a team at 12% whose specification queue grows every week is not.

Do you need a Kanban board to measure flow?

No. You need a start timestamp, a finish timestamp and the states in between for every item, and any issue tracker's history provides them. A board helps because it shows work item age where people already look. Without one, a daily list of open items sorted by age does the same job.

What age should prompt someone to look at an item?

When it passes the team's service level expectation, usually the 85th percentile cycle time of similar finished items. A gentler check at the 50th percentile catches items early. Set the thresholds per column: a build that normally takes an hour deserves a look after a day, while review needs its own number.